哈尔滨工程大学学报2023,Vol.44Issue(12):2201-2207,7.DOI:10.11990/jheu.202309012
热电联产压水堆核电机组解耦控制
Decoupling control of cogeneration PWR nuclear power plant
摘要
Abstract
To ensure the coordination and stability control among the primary circuit system,the secondary circuit system and the thermal energy supply system in the cogeneration reform of the operating nuclear power plant(NPP),this study investigated the decoupling control after the cogeneration reform of a pressurized water reactor(PWR)NPP.First,the object model of cogeneration PWR was developed to extract steam from the main steam pipe.The transfer functions of subsystems were obtained using the identification method.Then,the relative gain array method was used to analyze the coupling among subsystems of the model.Finally,the decoupling controller was designed using the unit matrix decoupling method,which was verified on the Matlab/Simulink simulation plat-form.The results show that the designed decoupling controller achieves a good decoupling effect for the systems af-ter the cogeneration reform.It also realizes the coordinated and stable control of the primary circuit,secondary cir-cuit,and thermal energy supply systems.Moreover,this study provides a reference for the design of coordination and stability control systems of other types of NPP after cogeneration reform.关键词
压水堆核电机组/热电联产/解耦控制/相对增益矩阵/耦合性分析/单位阵解耦/解耦控制器/协调稳定控制Key words
pressurized water reactor/cogeneration/decoupling control/relative gain array/coupling analysis/unit matrix decoupling/unit matrix decoupling/decoupling controller/coordination and stability control system分类
能源科技引用本文复制引用
张茹,孙培伟,魏新宇..热电联产压水堆核电机组解耦控制[J].哈尔滨工程大学学报,2023,44(12):2201-2207,7.基金项目
国家自然科学基金项目(11875218). (11875218)