摘要

Abstract

The mining of coal mine is bound to cause the movement and destruction of overlying rock mass.The height of water flowing fractured zone in fully mechanized mining face has become the key to establish hydraulic connection of overlying aquifer in coal seam mining,which restricts the safe mining of coal mine.Based on the geological and hydrogeological conditions of the thick coal seam mining area of Yuwu Mine of Lu'an Group,through the empirical formula calculation results,similar material simulation results and computer numerical simulation results,combined with the measured data of the water-conducting fracture zone in the working face of the adjacent mining area of the mine,the linear regression analysis of multi-data fusion was used to determine the height of the water-conducting fracture zone in the south fifth mining area.The value was 103.1~113.9 m,which provided scientific basis and parameters for the safety production and coal seam roof support of Yuwu Mine.

关键词

余吾煤矿/导水裂隙带/顶板破坏/计算机模拟

Key words

Yuwu Mine/water flowing fractured zone/roof failure/computer simulation

分类

矿山工程

引用本文复制引用

彭洪涛,周俊杰..余吾矿南五采区煤层顶板导水裂隙带高度预测研究[J].煤炭与化工,2023,46(11):71-74,85,5.

基金项目

教育部产学合作协同育人项目(220902251092933) (220902251092933)

河北省自然科学基金(D202240204) (D202240204)

邯郸市科学技术与发展研究项目(21422093268) (21422093268)

河北工程大学创新基金项目(SJ2101003034) (SJ2101003034)

煤炭与化工

2095-5979

访问量0
|
下载量0
段落导航相关论文