海洋钻井隔水管张紧环上壳体焊接工艺研究
Research on Welding Technology of the Upper Cover of Tension Ring for Marine Drilling Risers
摘要
Abstract
To solve the technical problem of integral forging processing for the upper cover of the tension ring of marine drilling riser,welded parts are used instead of integral forgings for the upper cover of the tension ring.The upper cover adopts a thick steel plate welding structure,with T-joints,K-grooves,and CJP welds.By analyzing the specific structure of the upper cover,the welding sequence of the upper cover was reasonably designed.The welding process qualification test was completed using a test plate with a limit plate joint,and the test results met the design requirements.The developed upper cover of the tensioning ring for marine riser can provide a reference for the"welding instead of forging"process of complex structural parts in related marine underwater equipment.关键词
海洋钻井隔水管/张紧环上壳体/焊接工艺评定/焊接试板Key words
marine drilling riser/upper cover of tension ring/welding procedure qualification/welding test plate分类
金属材料引用本文复制引用
柳锁贤,张小龙,郑家伟,王耀锋,杨艳,邓荣,王紫怡..海洋钻井隔水管张紧环上壳体焊接工艺研究[J].焊管,2023,46(12):53-57,63,6.基金项目
国家工信部高技术船舶科研项目"极地冷海安全高效钻完井设备及配套工艺关键技术研究"(项目编号CBG2N21-4-2). (项目编号CBG2N21-4-2)