江淮水利科技Issue(6):19-21,43,4.DOI:10.20011/j.cnki.JHWR.202306004
关于董铺水库工程等别提升的探讨
Discussion on grade improvement of Dongpu Reservoir project
摘要
Abstract
With the rapid development of our country's economy and society,significant changes have oc-curred in the operational environment and flood protection objectives of many existing reservoirs.The engineering standards and classifications determined during the dam construction phase no longer align with current control indicators.They are incompatible with the ongoing urban development and fail to adapt to the evolving needs.As a result,they cannot meet the new requirements posed by urban develop-ment in this new era for ensuring water safety and security.Taking the typical urban reservoir Dongpu Reservoir as an example,its storage capacity indicators,flood control indicators,water supply indi-cators,and accident impact indicators are reviewed according to the specifications.The corresponding engineering grades of the indicators are grade II,grade II,grade I,and grade II,respectively.This paper can serve as a reference for other urban reservoir projects and other improvement demonstrations.关键词
水库/工程等别/库容/防洪/供水/失事Key words
reservoir/engineering grade/storage capacity/control flood/water supply/crash分类
建筑与水利引用本文复制引用
连威,杨舒涵,陈朝旭..关于董铺水库工程等别提升的探讨[J].江淮水利科技,2023,(6):19-21,43,4.基金项目
国家重点研发计划项目(200YFC3005404) (200YFC3005404)