长输热网中继泵站分支设置方案分析

崔本明 崔鑫 张宇翔 胡皓青

煤气与热力2023,Vol.43Issue(12):19-21,3.
煤气与热力2023,Vol.43Issue(12):19-21,3.

长输热网中继泵站分支设置方案分析

Analysis of Branch Setting Schemes of Relay Pump Stations in Long-distance Heating Networks

崔本明 1崔鑫 2张宇翔 3胡皓青4

作者信息

  • 1. 华电吉木萨尔热电有限公司,新疆乌鲁木齐 830022
  • 2. 太原市热力集团有限责任公司万柏林供热分公司,山西太原 030001
  • 3. 乌鲁木齐甘泉堡经济技术开发区(工业区)规划建设管理局,新疆乌鲁木齐 830063
  • 4. 中国市政工程华北设计研究总院有限公司第六设计研究院,天津 300384
  • 折叠

摘要

Abstract

In view of the joint construction of the pressure isolation heating station and the relay pump station in long-distance heating network,the branch setting schemes of the relay pump station are analyzed.Combining engineering examples,the techni-cal economy of the schemes is compared.It is advisa-ble to use branch points to lead out in front of the relay pump station,which is technically and economically su-perior to branch points leading out behind the relay pump station.

关键词

长输热网/中继泵/分支/隔压热力站

Key words

long-distance heating network/re-lay pump/branch/pressure isolation heating station