Taking the bored pile construction of the main bridge auxiliary pier and junction pier of Honglian cross-sea project in Nansha District of Guangzhou City as an example,the key technology of full rotary casing drilling rig in the construction of bored pile in soft soil layer is studied.The results show that this technology has a good application effect in the bored pile construction in the land reclamation area,and can be widely used in the pile foundation construction under this kind of stratum conditions.关键词
跨海大桥/钻孔桩/施工工艺/软土层/泥浆循环Key words
cross-sea bridge/bored pile/construction technology/soft soil layer/mud circulation分类