科技创新与应用2024,Vol.14Issue(2):37-40,4.DOI:10.19981/j.CN23-1581/G3.2024.02.009
路权切换场景下铁路道口控制方案研究
摘要
Abstract
In recent years,with the increase of local railway private line projects,it is inevitable to involve the design of highway and railway level crossings.At present,the crossing signal control system usually follows the design principle of giving priority to railway rights,but in some special line projects of self-management and self-maintenance,enterprises do not have high requirements for railway transport efficiency.pay more attention to the impact on the surrounding environment and ensure the safety of highway traffic,and even cancel the railway right of way under some special conditions.According to the actual demand of the public railway right of the project under construction,this paper studies a scheme of the crossing signal control system in which the railway right is switched to the highway right first in a special scene.First of all,through the exposition of the actual conditions of the crossing under construction,this paper puts forward the need for the switching of road rights at the crossing.Then the control process of crossing equipment and the switching process of road rights under three scenarios are conceived,and the layout scheme and control logic design scheme of crossing equipment suitable for freight cars are studied and determined.Finally,the effect of road right switching is analyzed.The research results of this paper can be used as a reference for the design of similar projects.关键词
铁路/平交道口/公路路权/控制方案/特殊化设计Key words
railway/level crossing/highway right/control scheme/special design分类
交通工程引用本文复制引用
宋文婷..路权切换场景下铁路道口控制方案研究[J].科技创新与应用,2024,14(2):37-40,4.基金项目
中铁第四勘察设计院集团有限公司科研课题项目(2020K065) (2020K065)