地质异常区隧道正洞大变形施工方案

马时坤

科技创新与应用2024,Vol.14Issue(2):160-163,4.
科技创新与应用2024,Vol.14Issue(2):160-163,4.DOI:10.19981/j.CN23-1581/G3.2024.02.038

地质异常区隧道正洞大变形施工方案

马时坤1

作者信息

  • 1. 北京铁城建设监理有限责任公司,北京 100000
  • 折叠

摘要

Abstract

High stress and large deformation of soft rock are one of the difficulties in tunnel construction.In order to ensure the stability and order of tunnel construction,a scientific and reasonable construction scheme must be formulated according to the results of geological exploration.Taking a railway tunnel as an example,based on the geological conditions such as large buried depth,high stress and broken soft rock faced by construction,this paper discusses the active support construction scheme of large deformation in tunnel construction,and analyzes the key points of construction links,aiming to provide reference for similar tunnel construction.

关键词

地质异常区/隧道/大变形/施工方案/主动支护

Key words

geological anomaly area/tunnel/large deformation/construction scheme/active support

分类

交通工程

引用本文复制引用

马时坤..地质异常区隧道正洞大变形施工方案[J].科技创新与应用,2024,14(2):160-163,4.

科技创新与应用

2095-2945

访问量0
|
下载量0
段落导航相关论文