水电站机电技术2023,Vol.46Issue(12):1-3,95,4.DOI:10.13599/j.cnki.11-5130.2023.12.001
抽水蓄能电站负荷成组控制和紧急支援策略研究与实现
Research on and implementation of load group control and emergency support strategy for Pumped Storage Power Station
摘要
Abstract
Changlongshan Pumped Storage Power Station is governed by the East China Power Grid Dispatch Center.This paper provides a detailed explanation of the control strategy of load group pull slant,active power distribution strategy,unit startup and shutdown strategy,and the function of supporting the power grid in case of emergency.It also provides a method to calculate the power station's available support capacity in various operating conditions.The strategies introduced in this paper apply to pumped storage power stations governed by the East China Power Grid Dispatch Center and may also serve as a reference for other pumped storage power stations for dispatch purpose.关键词
抽水蓄能/AGC/成组控制/紧急支援Key words
pumped storage/AGC/group control/emergency support分类
水利科学引用本文复制引用
龚传利,陈绪鹏,连雪广,叶芾芃,张茜..抽水蓄能电站负荷成组控制和紧急支援策略研究与实现[J].水电站机电技术,2023,46(12):1-3,95,4.基金项目
本成果由雅砻江流域水电开发有限公司资助. ()