| 注册
首页|期刊导航|水电站机电技术|抽水蓄能电站负荷成组控制和紧急支援策略研究与实现

抽水蓄能电站负荷成组控制和紧急支援策略研究与实现

龚传利 陈绪鹏 连雪广 叶芾芃 张茜

水电站机电技术2023,Vol.46Issue(12):1-3,95,4.
水电站机电技术2023,Vol.46Issue(12):1-3,95,4.DOI:10.13599/j.cnki.11-5130.2023.12.001

抽水蓄能电站负荷成组控制和紧急支援策略研究与实现

Research on and implementation of load group control and emergency support strategy for Pumped Storage Power Station

龚传利 1陈绪鹏 2连雪广 3叶芾芃 1张茜1

作者信息

  • 1. 北京中水科水电科技开发有限公司,北京 100038
  • 2. 长龙山抽水蓄能电厂,浙江 安吉 313300
  • 3. 中国三峡建工(集团)有限公司,北京 101199
  • 折叠

摘要

Abstract

Changlongshan Pumped Storage Power Station is governed by the East China Power Grid Dispatch Center.This paper provides a detailed explanation of the control strategy of load group pull slant,active power distribution strategy,unit startup and shutdown strategy,and the function of supporting the power grid in case of emergency.It also provides a method to calculate the power station's available support capacity in various operating conditions.The strategies introduced in this paper apply to pumped storage power stations governed by the East China Power Grid Dispatch Center and may also serve as a reference for other pumped storage power stations for dispatch purpose.

关键词

抽水蓄能/AGC/成组控制/紧急支援

Key words

pumped storage/AGC/group control/emergency support

分类

水利科学

引用本文复制引用

龚传利,陈绪鹏,连雪广,叶芾芃,张茜..抽水蓄能电站负荷成组控制和紧急支援策略研究与实现[J].水电站机电技术,2023,46(12):1-3,95,4.

基金项目

本成果由雅砻江流域水电开发有限公司资助. ()

水电站机电技术

1672-5387

访问量2
|
下载量0