BIPV项目光伏屋顶防漏雨施工要点分析
Analysis of Construction Points for Rainproofing Photovoltaic Roofs of BIPV Projects
谢清华 1张俊阳 1陈明毅1
作者信息
- 1. 中国电建集团江西省电力设计院有限公司, 南昌 330096
- 折叠
摘要
Abstract
Preventing roof leakage during construction and operation and maintenance is a key issue in PV building integration projects.This paper relies on the actual project,analyzes the main reasons of PV roof leakage during the construction period of the project and puts forward a series of measures to solve the problem,which improves the quality of the roof leakage prevention construction of PV building integration project.关键词
光伏建筑一体化/光伏产业/施工质量/电力系统Key words
photovoltaic building integration/photovoltaic industry/construction quality/power system分类