RBC边界区段改方闪红光带问题分析与处理措施研究

邢毅

铁路通信信号工程技术2023,Vol.20Issue(z1):1-3,3.
铁路通信信号工程技术2023,Vol.20Issue(z1):1-3,3.DOI:10.3969/j.issn.1673-4440.2023.Z1.001

RBC边界区段改方闪红光带问题分析与处理措施研究

Analysis and Treatment Measures for Problem of Flashing Red-light Strap during Direction Change in RBC Boundary Sections

邢毅1

作者信息

  • 1. 北京全路通信信号研究设计院集团有限公司,北京 100070
  • 折叠

摘要

Abstract

During the process of incorporating the tuning zone into the control and inspection of the train control center,a red-light strap issue arose in the RBC boundary section during the direction change process.Based on the analysis of the occupancy conditions of the small track and the reasons of the red-light strap in direction change,a solution is proposed to modify the delay time of the receiver's small track circuit pick-up.This solution meets the requirement that the occupancy status of the small track is shorter than the tolerance time for TCC determining the small track occupancy status.This solution can solve the problem of flashing red-light straps in the RBC boundary sections after the direction change.

关键词

RBC边界/改方过程/延时吸起/红光带

Key words

RBC boundary section/direction change process/delayed pick-up/red-light strap