铁路通信信号工程技术2023,Vol.20Issue(z1):36-41,6.DOI:10.3969/j.issn.1673-4440.2023.Z1.009
ZPW-2000轨道电路与QJK-JS结合问题分析
Analysis of Combination of ZPW-2000 Track circuit and QJK-JS
吴伟华1
作者信息
- 1. 中国铁路南宁局集团有限公司,南宁 530022
- 折叠
摘要
Abstract
As an important part of the signal system,ZPW-2000 Track circuit and QJK-JS(section integrated monitoring system),the former can track and monitor the running position of the train in real time,and the latter can realize the released by checking three sections for the train running in the section.Both are important equipment to ensure the safe operation of the train.Their stability reliability is closely related to the safety and normal order of train operation.This paper analyzes the case of the combination of ZPW-2000 Track circuit and QJK-JS,proposes the control measures of construction quality source,solves the problem before the equipment is put into operation,ensures the stable and reliable use of ZPW-2000 Track circuit,and ensures the safety of train operation.关键词
ZPW-2000轨道电路/QJK-JS/联锁试验/图纸审查/验收/应急/维护Key words
ZPW-2000 track circuit/QJK-JS/interlocking test/drawing review/acceptance/emergency response/maintenance分类
交通工程引用本文复制引用
吴伟华..ZPW-2000轨道电路与QJK-JS结合问题分析[J].铁路通信信号工程技术,2023,20(z1):36-41,6.