| 注册
首页|期刊导航|铁路通信信号工程技术|全电子联锁车站接近区段电码化发码延迟的解决方案

全电子联锁车站接近区段电码化发码延迟的解决方案

张夫松

铁路通信信号工程技术2023,Vol.20Issue(z1):122-127,6.
铁路通信信号工程技术2023,Vol.20Issue(z1):122-127,6.DOI:10.3969/j.issn.1673-4440.2023.Z1.028

全电子联锁车站接近区段电码化发码延迟的解决方案

Solution to Delay of Code Sending in Approach Section of Stations with All-electronic Interlocking

张夫松1

作者信息

  • 1. 北京全路通信信号研究设计院集团有限公司,北京 100070
  • 折叠

摘要

Abstract

Compared with the time it takes to encode the codes for sending in relay interlocking when the approach section is occupied,the time delay in encoding for the all-electronic interlocking is more substantial,which affects the efficiency of train operation.To shorten the encoding time for the all-electronic interlocking,this paper describes a network connection solution that enables a direct connection between the track circuit module and the Track Coding Switch(TCS)module for the all-electronic interlocking.The network structure,communication protocol,coupling method,fault analysis and specific implementation are introduced in detail.This solution enables the TCS module to respond to the command of code sending for the occupied approach section as soon as possible,shortens the encoding time,and meets the on-site application requirements of the stations.

关键词

全电子联锁/电码化/轨道电路/发码时间

Key words

all-electronic interlocking/Track Coding Switch(TCS)/track circuit/time of code sending

分类

交通工程

引用本文复制引用

张夫松..全电子联锁车站接近区段电码化发码延迟的解决方案[J].铁路通信信号工程技术,2023,20(z1):122-127,6.

铁路通信信号工程技术

1673-4440

访问量2
|
下载量0
段落导航相关论文