Abstract
Taking the steel reinforcement construction model of Zhangzhou"Hualong No.1"nuclear island civil engineering as the data interactive carrier,the two-dimensional design drawing information is transformed into a standardized steel reinforcement bill of materials through three-dimensional BIM software,which improves the problems of inconsistent and diverse forms of drawings'annotation in the traditional steel reinforcement in-depth design,integrates the automatic steel reinforcement processing equipment for BIM data integration,reduces manual input operations.In the distribution process of semi-finished steel reinforcement,develop a steel reinforcement positioning system that matches the steel reinforcement management process,and optimize the steel reinforcement distribution into a supervision mode with online as the main line and offline as the auxiliary,reducing the loss rate of steel reinforcement in the complex environment of nuclear island construction.At the same time,optimize the process,and connect the three key business processes of BIM cutting,automatic processing equipment,and positioning and distribution in the steel reinforcement management process with data.Using visualization technology to improve the efficiency of steel reinforcement transportation and achieve precise cost control of steel reinforcement main materials.关键词
BIM下料/钢筋定位/系统集成Key words
BIM cutting/steel reinforcement positioning/system integration分类
信息技术与安全科学引用本文复制引用