云南水力发电2023,Vol.39Issue(12):52-56,5.DOI:10.3969/j.issn.1006-3951.2023.12.011
连续复杂多变环境下顶管施工的扰动分析及控制措施
Disturbance Analysis and Control Measures for Pipe Jacking Construction in Continuously Variable and Complex Environment
尹晓斌 1王强 1胡涛 1马泽锋 1马海容1
作者信息
- 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
- 折叠
摘要
Abstract
During the process of pipe jacking construction,it is difficult to avoid the complex environment of the construction area,which has a significant impact on pipe jacking construction.This paper analyzes the geological conditions of the top pipe construction process in the improvement project of urban domestic sewage pipeline network in the Xiaodongjiang River Basin of Maoming City.It focuses on the disturbance of surface buildings and existing pipelines caused by pipe jacking construction in continuous,complex and ever-changing environments,as well as the potential risks during the construction process.In response to the above problems,corresponding measures have been proposed in the process of jacking,when jacking pipes into and out of the hole,and in terms of thixotropic mud.关键词
连续多变/复杂环境/顶管施工/扰动控制措施Key words
continuously variable/complex environment/pipe jacking/disturbance control measure分类
建筑与水利引用本文复制引用
尹晓斌,王强,胡涛,马泽锋,马海容..连续复杂多变环境下顶管施工的扰动分析及控制措施[J].云南水力发电,2023,39(12):52-56,5.