一体化提升泵站井桶变形处理措施

何富国

云南水力发电2023,Vol.39Issue(12):193-196,4.
云南水力发电2023,Vol.39Issue(12):193-196,4.DOI:10.3969/j.issn.1006-3951.2023.12.042

一体化提升泵站井桶变形处理措施

Treatment Measures for Deformation of Well Barrels in Integrated Lifting Pump Station

何富国1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

The integrated lifting pump station of municipal engineering is often arranged in low-lying areas,with abundant groundwater.In complex locations,there is often leakage after the bottom of the sunken well is sealed.If the product design does not fully consider the convenience of pouring concrete outside the pump station's well barrel,and the concrete cannot be poured tightly,it will lead to deformation of the well barrel and internal mechanical and electrical equipment in the later stage,ultimately leading to failure and inability to operate.After the deformation accident of the pump station well barrel occurred in the first section of Dongguan Water Ecology Phase V,the project department analyzed the photos and operational data of the accident process.In the end,it took measures such as anchor rod reinforcement,concrete filling for reinforcement,and renovation of deformed mechanical and electrical equipment.The pump station finally resumed normal operation.

关键词

提升泵站/变形/故障/固定补强/机电设备/改造

Key words

lifting pump station/deformation/fault/fixed reinforcement/electromechanical equipment/transform