云南水力发电2023,Vol.39Issue(12):297-303,7.DOI:10.3969/j.issn.1006-3951.2023.12.066
南欧江流域梯级水电站联合防洪调度研究
Research on Joint Flood Control Operation of Cascade Hydropower Stations in Nam Ou River Basin
卢鹏 1杨子俊 1余江游 1杨开斌 1周鹏程1
作者信息
- 1. 中国电建集团昆明勘测设计研究院有限公司,云南 昆明 650051
- 折叠
摘要
Abstract
Based on the hydrological and meteorological conditions,engineering characteristics,and flood control requirements of cascade hydropower stations in Nam Ou River Basin,this paper conducts research on joint flood control scheduling of cascade hydropower stations in the basin.Based on the analysis results of the flood control capacity,flood control standards,and regional flood composition of key flood control objects in the basin,from the perspective of basically not affecting the power generation operation of cascade hydropower stations in the basin while also considering the flood control requirements of the basin,a plan for controlling the operating water level and discharge flow during the cascade flood season is proposed.Simulation scheduling analysis shows that the proposed flood control scheduling scheme is simple to operate and easy to implement.Although the cascade power consumption has slightly decreased,the reduction is not significant,which can provide certain guidance for the cascade flood control in Nam Ou River Basin.关键词
南欧江流域/梯级水电站/联合防洪调度/汛期水位控制Key words
Nam Ou River Basin/cascade hydropower station/joint flood control dispatch/flood season water level control分类
建筑与水利引用本文复制引用
卢鹏,杨子俊,余江游,杨开斌,周鹏程..南欧江流域梯级水电站联合防洪调度研究[J].云南水力发电,2023,39(12):297-303,7.