云南水力发电2023,Vol.39Issue(12):304-309,6.DOI:10.3969/j.issn.1006-3951.2023.12.067
抽水蓄能电站移民安置前期规划工作的几点思考
Several Thoughts on the Planning of Land Requisition and Resettlement for Pumped Storage Power Stations
何仕强 1祁芯羽1
作者信息
- 1. 中国电建集团昆明勘测设计研究院有限公司,云南 昆明 650051
- 折叠
摘要
Abstract
Starting from the characteristics of pumped storage power station construction and the problems in the early planning of resettlement,this paper analyzes and summarizes the work requirements for the early planning of resettlement in pumped storage power stations.It innovatively proposes the use of ArcGIS software to quickly and efficiently calculate the land acquisition area for the construction of pumped storage power stations,query sensitive information such as ecological red lines and basic farmland within the land acquisition scope,summarize and maintain physical indicator data,and carry out resettlement planning work.At the same time,this method is applied to the resettlement planning of LX Pumped Storage Power Station.Compared with the traditional resettlement planning and design approach of hydropower projects,it has good application effects in shortening the design cycle,improving work efficiency and quality.关键词
抽水蓄能电站/建设征地/移民安置前期规划/ArcGISKey words
pumped storage power station/land requisition/resettlement planning/ArcGIS分类
社会科学引用本文复制引用
何仕强,祁芯羽..抽水蓄能电站移民安置前期规划工作的几点思考[J].云南水力发电,2023,39(12):304-309,6.