| 注册
首页|期刊导航|云南水力发电|新建某中型水库工程施工导流方案研究

新建某中型水库工程施工导流方案研究

罗明华

云南水力发电2023,Vol.39Issue(12):344-348,5.
云南水力发电2023,Vol.39Issue(12):344-348,5.DOI:10.3969/j.issn.1006-3951.2023.12.074

新建某中型水库工程施工导流方案研究

Research on Construction Diversion Scheme for a New Medium sized Reservoir Project

罗明华1

作者信息

  • 1. 中国电建甘肃能源投资有限公司,甘肃 兰州 730000
  • 折叠

摘要

Abstract

Based on specific construction conditions,the project adopts a phased diversion design scheme,with the first phase enclosing the right bank and the second phase enclosing the left bank.It can not only meet the needs of river diversion and safe flood control at the construction site,but also enable the continuous and rapid construction of the reservoir dam,laying the foundation for safe,reliable,energy-saving,economical and efficient construction,and ensuring the smooth progress of the subsequent stages of the project.

关键词

中型水库/工程地质/导流方式比选/导流建筑物设计/导流施工

Key words

medium reservoir/engineering geology/comparison and selection of diversion methods/design of diversion structure/diversion construction

分类

建筑与水利

引用本文复制引用

罗明华..新建某中型水库工程施工导流方案研究[J].云南水力发电,2023,39(12):344-348,5.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文