Abstract
Based on specific construction conditions,the project adopts a phased diversion design scheme,with the first phase enclosing the right bank and the second phase enclosing the left bank.It can not only meet the needs of river diversion and safe flood control at the construction site,but also enable the continuous and rapid construction of the reservoir dam,laying the foundation for safe,reliable,energy-saving,economical and efficient construction,and ensuring the smooth progress of the subsequent stages of the project.关键词
中型水库/工程地质/导流方式比选/导流建筑物设计/导流施工Key words
medium reservoir/engineering geology/comparison and selection of diversion methods/design of diversion structure/diversion construction分类
建筑与水利引用本文复制引用