城市建筑2023,Vol.20Issue(24):190-192,199,4.DOI:10.19892/j.cnki.csjz.2023.24.52
EPC项目施工部署视角下的建筑规划设计把控要点
Key Points of Architectural Planning and Design Control from the Perspective of EPC Project Construction Deployment
摘要
Abstract
The construction project involves decision-making,evaluation,planning,design,construction,completion acceptance and delivery.Under the background of the design and construction of EPC project general contracting,from the perspectives of project economy and construction convenience,the paper takes the construction deployment of tower crane yard and construction road as the research point,and tries to discuss the preliminary design of the construction project,and the key design points,such as building layout,road planning,and architectural design,etc.in the design scheme,and puts forward optimization opinions,so as to achieve the purpose of optimizing the overall benefits of the project.关键词
EPC工程/塔吊堆场/施工道路/设计前期/建筑布局/道路规划Key words
EPC engineering/tower crane and storage yard/construction road/pre-design stage/building layout/road planning分类
建筑与水利引用本文复制引用
吴清,鲁爱国,梁锐..EPC项目施工部署视角下的建筑规划设计把控要点[J].城市建筑,2023,20(24):190-192,199,4.