| 注册
首页|期刊导航|城市建筑|深基坑工程施工过程灾变分析及抢险救灾对策研究

深基坑工程施工过程灾变分析及抢险救灾对策研究

高飞 宜清正

城市建筑2023,Vol.20Issue(24):212-214,3.
城市建筑2023,Vol.20Issue(24):212-214,3.DOI:10.19892/j.cnki.csjz.2023.24.58

深基坑工程施工过程灾变分析及抢险救灾对策研究

Analysis on Disasters of Deep Foundation Pit Engineering in Construction Process and Countermeasures for Emergency Rescue and Disaster Relief

高飞 1宜清正1

作者信息

  • 1. 江苏国信靖江发电有限公司
  • 折叠

摘要

Abstract

Taking Jingjiang base project of coal logistics in Jiangsu Province in Xingang operation area of Jingjiang port area of Taizhou port as an example,the factors causing disasters in the construction process of the land road pile construction project of the second phase of the project are analyzed,and on this basis,various countermeasures for emergency rescue and disaster relief are proposed.Based on the monitoring data of the foundation pit enclosure,the disaster sources during the construction of foundation pit are compared,analyzed and graded,and the design and construction measures for the foundation pit enclosure structure under the adverse geological conditions of Jingjiang Port Area of Taizhou Port are put forward.It provides a reference for the construction control and emergency rescue and disaster relief plans of related foundation pit projects.

关键词

泰州港靖江港区/深基坑/施工过程/灾变分析/抢险救灾对策

Key words

Jingjiang Port Area of Taizhou Port/deep foundation pit/construction process/disaster analysis/rescue and disaster relief countermeasures

分类

建筑与水利

引用本文复制引用

高飞,宜清正..深基坑工程施工过程灾变分析及抢险救灾对策研究[J].城市建筑,2023,20(24):212-214,3.

城市建筑

1673-0232

访问量0
|
下载量0
段落导航相关论文