电网技术2023,Vol.47Issue(12):4926-4936,11.DOI:10.13335/j.1000-3673.pst.2023.1325
负荷高密度地区中计及灵活性不足风险的储能优化配置
Optimal Configuration of Energy Storage Considering the Risk of Insufficient Flexibility in High Load Density Areas
摘要
Abstract
The existing transmission channels in high load density areas are limited and the proportion of flexible power sources in the system is low,so the adjustment ability to deal with the random fluctuation of renewable energy at the source end and load demand at the load end is insuffiicient.As an efficient flexible resource,energy storage system(ESS)has the advantages of fast response and two-way power conversion,which can provide flexible support for power system.Based on the bi-level programming model,this paper establishes an energy storage optimization configuration method to improve the overall and local flexibility of high-density load areas.The upper model makes strategic decisions on the configuration scheme of energy storage.The lower layer model simulates the operation of typical daily scenarios based on scenario analysis and uses CVaR to quantify the risk cost of insuffiicient flexibility.The model fully considers the balance of power supply and demand,new energy consumption and the supporting role of grid structure.The double-layer model is transformed into a single-layer model by adding association constraints.Finally,the commercial software package GUROBI is called through the MATLAB platform to complete the mixed integer programming optimization,and the optimal configuration scheme is obtained.The effectiveness of the configuration method is verified in a high load density area of an actual system.关键词
可再生能源/整体和局部灵活性/双层规划/储能配置Key words
renewable energy/global and local flexibility/bi-level programming/energy storage configuration分类
动力与电气工程引用本文复制引用
张海波,胡玉康,李正荣,王国荣..负荷高密度地区中计及灵活性不足风险的储能优化配置[J].电网技术,2023,47(12):4926-4936,11.基金项目
国家重点研发计划项目(2022YFB2403100).Project Supported by National Key Research & Development Program of China(under Grant 2022YFB2403100). (2022YFB2403100)