西津水电站汛期控制运行水位调整方案研究

叶飞武

红水河2023,Vol.42Issue(6):9-13,5.
红水河2023,Vol.42Issue(6):9-13,5.DOI:10.3969/j.issn.1001-408X.2023.06.003

西津水电站汛期控制运行水位调整方案研究

Control Operating Level Adjustment Plan for Flood Season of Xijin Hydropower Station

叶飞武1

作者信息

  • 1. 广西壮族自治区水利电力勘测设计研究院有限责任公司, 广西 南宁 530023
  • 折叠

摘要

Abstract

In order to promote the green and low-carbon transformation of energy and further tap the regulation potential of Xijin Hydropower Station,based on the construction of flood control system in Yujiang River Basin and the dispatching operation of Xijin Hydropower Station over the years,the water level adjustment scheme of flood season control operation is put forward by means of forecast dispatching method and pre-discharge capacity constraint method,and the impact,risk and benefit of dispatching scheme are analyzed.The results show that the scheme is operable,the risk is controllable,and there is a certain power generation benefit,which can provide reference for the fine scheduling of Xijin Hydropower Station in flood season.

关键词

控制运行水位/汛期/预报调度法/预泄能力约束法/西津水电站

Key words

control operating level/flood season/forecast scheduling method/pre-discharge capacity constraint method/Xijin Hydropower Station