红水河2023,Vol.42Issue(6):123-126,4.DOI:10.3969/j.issn.1001-408X.2023.06.024
乌江干流梯级水电站群自主检修核心能力构建
Core Competence Construction of Self Maintenance for Cascade Hydropower Stations in the Main Stream of Wujiang River
张围围1
作者信息
- 1. 贵州乌江水电开发有限责任公司, 贵州 贵阳 550002
- 折叠
摘要
Abstract
The cascade hydropower stations in the Wujiang River Basin are faced with the maintenance requirements of a large number of units,which involves a large number of maintenance tasks and management work.In order to formulate a comprehensive and detailed standardized process for the whole process of maintenance,it is necessary to start from the top-level design,personnel training,brand building and other dimensions to build the core competence of self maintenance for cascade hydropower stations in the main stream of Wujiang River.The author analyzes the necessity and development ideas of the core competence construction of self maintenance,and expounds the main contents of the core competence construction of self maintenance,which can provide some reference for the standardized management of self maintenance for hydropower stations in the basin.关键词
自主检修/梯级水电站群/核心能力/乌江干流Key words
self maintenance/cascade hydropower stations/core competence/main stream of Wujiang River分类
建筑与水利引用本文复制引用
张围围..乌江干流梯级水电站群自主检修核心能力构建[J].红水河,2023,42(6):123-126,4.