After the reformation of Unit 2 in Xijin Hydropower Plant,the output of the hydroturbine increased from 57.2 MW to 65 MW,resulting in insufficient operating torque of the guide vane lever.Therefore,it is necessary to reform the guide vane lever to increase the operating torque of the distributor.By calculating the operating torque of the guide vane,measuring the initial angle of the guide vane,and re-determining the eccentric angle of the guide vane lever shear pin,the guide vane lever and the connecting lever are modified.The modified guide vane lever meets the operation requirements of the unit under various water heads and output states.Practice has proved that the reformation of Unit 2 in Xijin Hydropower Plant has achieved the expected goal through of the guide vane lever reformation without replacing the guide vane.关键词
水轮机/导叶臂/操作力矩/改造/西津水电厂Key words
hydroturbine/guide vane lever/operating torque/reformation/Xijin Hydropower Plant分类
能源科技引用本文复制引用
刘文中..西津水电厂2号水轮机导叶臂改造及应用[J].红水河,2023,42(6):127-132,6.基金项目
广西桂冠电力股份有限公司西津水电厂 2 号机组增容改造项目 ()