山东煤炭科技2023,Vol.41Issue(12):1-4,14,5.DOI:10.3969/j.issn.1005-2801.2023.12.001
挖金湾矿无煤柱自成巷技术关键参数研究与应用
Research and Application of Key Parameters of Non Coal Pillar Self Formed Roadway Technology in WaJinwan Mine
谷伟强1
作者信息
- 1. 晋能控股煤业集团挖金湾煤业有限责任公司,山西 大同 037042
- 折叠
摘要
Abstract
In order to achieve self formed roadway mining without coal pillars,using the 8106 fully mechanized mining face of WaJinwan Mine as the experimental face,numerical simulation and surrounding rock displacement monitoring were used,and technical measures such as roof cutting pressure relief,roadway reinforcement,and goaf sealing were adopted.The main parameters were studied,and the reasonable depth of the cutting seam was determined to be 7 m and the angle was 15°.Constant resistance and large deformation anchor cables were used for reinforcement and support.Mine pressure monitoring shows that the deformation of the surrounding rock in the retained roadway is small,and the support effect is good.关键词
无煤柱/切顶/支护Key words
non coal pillar/roof cutting/support分类
矿业与冶金引用本文复制引用
谷伟强..挖金湾矿无煤柱自成巷技术关键参数研究与应用[J].山东煤炭科技,2023,41(12):1-4,14,5.