长平矿五盘区煤层大巷过陷落柱支护技术研究
Research on Support Technology for the Coal Seam Main Roadway Passing Through Collapse Columns in the Fifth Panel Area of Changping Mine
史文龙1
作者信息
- 1. 晋城宏圣金成矿山建筑工程有限责任公司,山西 晋城 048000
- 折叠
摘要
Abstract
In view of the serious deformation problem of the coal seam main roadway passing through the collapse column area in the fifth panel area of Changping Mine,the geological and mechanical parameters of the roadway surrounding rock are mastered through ground stress testing,surrounding rock strength testing,and surrounding rock structure observation.The reasons for the deformation of the coal seam main roadway are analyzed,and a targeted support scheme for the rubber wheel truck roadway passing through the DX176 collapse column in the fifth panel area is designed.The on-site test shows that the overall deformation of the test roadway is not significant,and the anchor cable stress is within a reasonable range,meeting the requirements for the use of the coal seam main roadway,with significant economic benefits.关键词
煤层大巷/陷落柱/支护设计Key words
coal seam main roadway/collapse column/support design分类
矿业与冶金引用本文复制引用