| 注册
首页|期刊导航|山东煤炭科技|大断面开切眼顶板水力压裂后稳定性判别与控制

大断面开切眼顶板水力压裂后稳定性判别与控制

马清水

山东煤炭科技2023,Vol.41Issue(12):10-14,5.
山东煤炭科技2023,Vol.41Issue(12):10-14,5.DOI:10.3969/j.issn.1005-2801.2023.12.003

大断面开切眼顶板水力压裂后稳定性判别与控制

Stability Discrimination and Control After Hydraulic Fracturing of Large Cross Section Open Cutting Hole Roof

马清水1

作者信息

  • 1. 华电煤业集团有限公司,北京 100035
  • 折叠

摘要

Abstract

The Longde Coal Mine usually uses single body passive reinforcement support for the open cutting holes,which is costly and labor-intensive.Using on-site measurement and theoretical analysis,the stability and feasibility of active support of the 213 open cutting hole roof after hydraulic fracturing are demonstrated.A"W-shaped steel belt+anchor cable"one belt three anchor reinforcement support scheme is proposed to replace the single body pillar passive reinforcement support.The results show that the maximum value of deep separation layer of the roof after hydraulic fracturing is 4 mm,and the maximum value of shallow separation layer is 7 mm.The self stability of the roof is still good.The maximum displacement amount of the top and floor after active support is 7.2 mm,and the maximum displacement amount of the two sides is 5.8 mm,achieving the expected effect.

关键词

大断面/切眼/压裂/顶板

Key words

large cross section/hole cutting/fracture/roof

分类

矿业与冶金

引用本文复制引用

马清水..大断面开切眼顶板水力压裂后稳定性判别与控制[J].山东煤炭科技,2023,41(12):10-14,5.

山东煤炭科技

1005-2801

访问量0
|
下载量0
段落导航相关论文