世界有色金属Issue(20):175-177,3.
厂坝铅锌矿井下地质管理工作浅析
Analysis of underground geological management in Changba Lead-zinc Mine
蔡拓 1胡文荣 1李知栋1
作者信息
- 1. 甘肃厂坝有色金属有限责任公司厂坝铅锌矿地质测量部,甘肃 成县 742504
- 折叠
摘要
Abstract
Underground geology management is a production management carried out by mining geology department together with other production and technical departments of mines.It is an important work content of mine production technology management.It is mainly used for deep exploration in the early stage of mines.The whole process of roadway exploration and driving,sounding and water exploration,ore distribution research and ore body delineation,ore dilution rate and loss rate management,roadway roof risk grade assessment,face and room grade management,mine reserves calculation and mining is the responsibility of every mine geologist.Be the first responsible person for the mine's geological reserves,service life,safe production,ore quantity connection and other work.It is also of great significance to ensure the sustainable development of mines,ensure the safe and efficient production of mines and improve the economic benefits of mines.关键词
地质管理/坑探掘进/品味管理/贫化率/损失率Key words
geological management/To dig into a pit/Taste management/Dilution rate/Loss rate分类
矿业与冶金引用本文复制引用
蔡拓,胡文荣,李知栋..厂坝铅锌矿井下地质管理工作浅析[J].世界有色金属,2023,(20):175-177,3.