设备监理Issue(6):22-26,5.DOI:10.19919/j.issn.2095-2465.2023.12.006
城市轨道交通弱电系统接口调试的监理实践和策略
Supervision Practice and Strategy of Interface Debugging of Weak Current System in Urban Rail Transit
朱金泉1
作者信息
- 1. 三方建设集团有限公司 杭州 310000
- 折叠
摘要
Abstract
The supervision work of urban rail transit weak current system mainly includes two parts:the supervision of system equipment installation stage and the supervision of system debugging stage.Doing a good job in the supervision of the system debugging stage and urging the system integration unit to implement debugging according to the established scheme and plan is an important guarantee for the system function and performance to achieve the design requirements.Based on the supervision practice of the weak current system of Shaoxing urban rail Transit Line 2 phase Ⅰ project,this paper analyzes the supervision process of the relevant interface debugging of the cloud platform system,summarizes and puts forward the supervision strategy for the weak current system debugging process.关键词
城市轨道交通/弱电系统云平台/监理策略Key words
Urban rail transit/Weak current system cloud computing platform/Supervision strategy分类
通用工业技术引用本文复制引用
朱金泉..城市轨道交通弱电系统接口调试的监理实践和策略[J].设备监理,2023,(6):22-26,5.