中国电机工程学报2023,Vol.43Issue(24):9461-9469,中插7,10.DOI:10.13334/j.0258-8013.pcsee.232102
巴西"8.15"大停电事故分析及启示
Analysis and Lessons of Brazil Blackout Event on August 15,2023
王国春 1董昱 1许涛 1贺静波 1何剑 2张一驰2
作者信息
- 1. 国家电网有限公司,北京市 西城区 100031
- 2. 中国电力科学研究院有限公司,北京市 海淀区 100192
- 折叠
摘要
Abstract
On Aug.15th,2023,a large-scale blackout occurred in the Brazil power system.The National Interconnected System(SIN)was divided into three parts:the northern,northeastern and southeastern/midwestern/southern power grids,with the power loss of 23368MW and the longest time duration of 6 hours,which has serious impact on daily production and life.In this paper,the general situations of the Brazil power system including generation,grid and load are introduced.Then,the all-stage propagation processes of the blackout are given.On this basis,the direct causes of the blackout,as well as the deep reasons from 4 aspects such as power grid structure,power source support,technical defense and security control,are analyzed.Finally,considering the actual situations of China's power system,the correlative suggestions are proposed to guarantee safe operation of the power system under the clean and low-carbon transformation situation.关键词
巴西电网/大停电事故/电网解列/频率崩溃/新能源Key words
Brazil power system/blackout/power system splitting/frequency collapse/new energy分类
信息技术与安全科学引用本文复制引用
王国春,董昱,许涛,贺静波,何剑,张一驰..巴西"8.15"大停电事故分析及启示[J].中国电机工程学报,2023,43(24):9461-9469,中插7,10.