| 注册
首页|期刊导航|长江科学院院报|基于复合模型沙的大比尺尾矿库漫顶溃决模型试验

基于复合模型沙的大比尺尾矿库漫顶溃决模型试验

易富 陶晗 杜常博 戚旭鹏 翟巍昆 徐展

长江科学院院报2024,Vol.41Issue(1):83-89,7.
长江科学院院报2024,Vol.41Issue(1):83-89,7.DOI:10.11988/ckyyb.20221207

基于复合模型沙的大比尺尾矿库漫顶溃决模型试验

Modelling of Overtopping Break of Large Scale Tailings Pond Using Composite Model Sand

易富 1陶晗 2杜常博 2戚旭鹏 3翟巍昆 2徐展2

作者信息

  • 1. 辽宁工程技术大学建筑与交通学院,辽宁阜新 123000
  • 2. 辽宁工程技术大学土木工程学院,辽宁阜新 123000
  • 3. 建研地基基础工程有限责任公司,北京 100000
  • 折叠

摘要

Abstract

To better predict the impacts of tailings pond breaches and quantitatively understand the breach process and downstream effects,we prepared a composite model sand by mixing fine-grained tailing sand and expanded per-lite in a 1.5:1 volume ratio.Indoor tests and measurements of underwater angle of repose confirmed the feasibility of the composite model sand under similar conditions.Based on this,we conducted large-scale overtopping dam failure tests under extreme conditions to analyze the changes in dam breach process,flow process,section morphol-ogy evolution,phreatic line,inundation elevation and range.The physical model test lasted 140 minutes,during which the composite model sand discharge accounted for 10.76%of the total storage capacity,and downstream silt-ation accounted for 95.21%of this discharge.These results are consistent with the real-world situation of overtop-ping failure,demonstrating the reasonability and effectiveness of the composite model sand for more realistically simulating tailings pond breach processes.These findings also offer new insights for selecting model sand in future o-vertopping failure tests for tailings pond.

关键词

复合模型沙/尾矿库/漫顶溃坝/模型试验/浸润线

Key words

composite model sand/tailings pond/overtopping dam failure/model test/phreatic line

分类

水利科学

引用本文复制引用

易富,陶晗,杜常博,戚旭鹏,翟巍昆,徐展..基于复合模型沙的大比尺尾矿库漫顶溃决模型试验[J].长江科学院院报,2024,41(1):83-89,7.

基金项目

辽宁省教育厅青年基金项目(LJKQZ2021153) (LJKQZ2021153)

辽宁工程技术大学学科创新团队项目(LNTU20TD-12) (LNTU20TD-12)

长江科学院院报

OACSTPCD

1001-5485

访问量6
|
下载量0
段落导航相关论文