某双舱管廊总体布局与节点设计优化

尚婷婷 何思亮

市政技术2024,Vol.42Issue(1):131-137,7.
市政技术2024,Vol.42Issue(1):131-137,7.DOI:10.19922/j.1009-7767.2024.01.131

某双舱管廊总体布局与节点设计优化

Optimization of Overall Layout and Node Design of a Double-cable Utility Tunnel

尚婷婷 1何思亮1

作者信息

  • 1. 中建四局安装工程有限公司,广东广州 510700
  • 折叠

摘要

Abstract

Taken a double-cable utility tunnel as an example,the functional requirements of each section of fire protection,ventilation,power supply and distribution,drainage,escape and hoisting.It is believed that the overall layout of the utility tunnel should be optimized based on production and operation requirements;Combined with the integrity of the flow,the node of escape and hoisting and section design are analyzed from the aspects of pipeline entry,aily inspections,emergency evacuation,etc.to provide design key points;Some safety hazards of water log-ging,falling,and evacuation obstacles that may occur during the design are discussed.The improvement ideas of detailed practices is briefly described,which can provides references for similar projects in utility tunnels to en-hance the operational service quality.

关键词

管廊/总体布局/功能区间/节点设计/优化/流线

Key words

utility tunnel/overall layout/function section/node design/optimize/flow line

分类

土木建筑

引用本文复制引用

尚婷婷,何思亮..某双舱管廊总体布局与节点设计优化[J].市政技术,2024,42(1):131-137,7.