摘要

Abstract

As a subversive transportation system,ultra-high-speed low-vacuum maglev transportation will change human production and life style to a certain degree,and become a landmark to lead the development of world transportation technology.But at the same time,it is also a super-large and complex system engineering,which requires repeated verification tests before it is actually implemented.The test lines currently built in China that are only used for simulation are far from achieving the purpose of systematic engineering verification tests.In this context,it is necessary to build a special test base with rich functions and complete supporting facilities to meet the test requirements of the overall scheme and key technologies of the ultra-high-speed low-vacuum maglev transportation system.Taking the construction of the ultra-high-speed low-vacuum maglev traffic test base in Yanggao County,Datong City,Shanxi Province as an example.Firstly,the general overview of the test base and its functional positioning in different periods are discussed.The composition of the test base is analyzed,and then the principles and difficulties of the general layout of the test base are analyzed,and the specific technical requirements for the general layout of the test base on houses、roads、test lines and comprehensive pipelines are put forward.Combined with the above control factors,through the comparison and selection of the general layout plan,a general layout plan that saves investment、concentrates land and closely meets the test needs is formed.Finally,the core and key points of the general plane design of the test base,the problems that need attention,and the future development research direction are proposed and prospected.

关键词

低真空磁浮交通/试验基地/功能定位/试验流程/总平面构成/总平面布置

Key words

low vacuum maglev traffic/test base/function positioning/test process/general plane composition/general plane layout