西北水电Issue(6):25-29,5.DOI:10.3969/j.issn.1006-2610.2023.06.005
小石峡水电站集鱼系统布置方案选择研究
Study on Layout Scheme Selection of Fish Collection System for Xiaoshixia Hydropower Station
潘文光 1寇晓梅 1万帆1
作者信息
- 1. 中国电建集团西北勘测设计研究院有限公司,西安 710065
- 折叠
摘要
Abstract
The layout scheme selection of fish collection system for built hydropower stations is different from selection of planned hydro-power projects.It requires to consider both the fish collection effect of fish passage system and the impact on built hydropower station.This article takes the layout scheme selection of fish collection system for the Xiaoshixia hydropower station as an example,conducts a comparative study on four proposed layout schemes of fish collection system from the perspectives of fish trap flow conditions,fish cluster investigation,power generation tailwater impact,flood safety impact,and construction period impact,and recommends the left bank fish collection tank type(50 m from the end of tailwater channel).The results can provide a reference for the design of fish passing in similar built power stations.关键词
集鱼系统/布置方案/水流/尾水Key words
fish collection system/layout scheme/water flow/tailwater分类
水产学引用本文复制引用
潘文光,寇晓梅,万帆..小石峡水电站集鱼系统布置方案选择研究[J].西北水电,2023,(6):25-29,5.