首页|期刊导航|中国电机工程学会电力与能源系统学报(英文版)|Multifactor-influenced Reliability-constrained Reserve Expansion of Integrated Electricity-gas Systems Considering Failure Propagation
中国电机工程学会电力与能源系统学报(英文版)2023,Vol.9Issue(6):2236-2250,15.DOI:10.17775/CSEEJPES.2021.06630
Multifactor-influenced Reliability-constrained Reserve Expansion of Integrated Electricity-gas Systems Considering Failure Propagation
Multifactor-influenced Reliability-constrained Reserve Expansion of Integrated Electricity-gas Systems Considering Failure Propagation
摘要
关键词
Cross-sectorial failure propagation/fuzzy model/integrated electricity-gas systems/long-term reserve planning/reliabilityKey words
Cross-sectorial failure propagation/fuzzy model/integrated electricity-gas systems/long-term reserve planning/reliability引用本文复制引用
Minglei Bao,Xiaocong Sun,Yi Ding,Chengjin Ye,Changzheng Shao,Sheng Wang,Yonghua Song..Multifactor-influenced Reliability-constrained Reserve Expansion of Integrated Electricity-gas Systems Considering Failure Propagation[J].中国电机工程学会电力与能源系统学报(英文版),2023,9(6):2236-2250,15.基金项目
This work was supported by the China NSFC under Grant 71871200 and National Natural Science Foundation China and Joint Programming Initiative Urban Europe Call(NSFC-JPI UE)under grant 71961137004. (NSFC-JPI UE)