| 注册
首页|期刊导航|电测与仪表|考虑㶲损失的三联供系统容量配置与运行模式研究

考虑㶲损失的三联供系统容量配置与运行模式研究

王剑锋 王旭东 李峰 戚艳 邬斌扬 苏万华

电测与仪表2024,Vol.61Issue(1):113-118,6.
电测与仪表2024,Vol.61Issue(1):113-118,6.DOI:10.19753/j.issn1001-1390.2024.01.017

考虑㶲损失的三联供系统容量配置与运行模式研究

Research on capacity allocation and operation mode of triple-generation system considering exergy loss

王剑锋 1王旭东 1李峰 2戚艳 3邬斌扬 2苏万华2

作者信息

  • 1. 国网天津市电力公司,天津 300010
  • 2. 天津大学机械工程学院,天津 300350
  • 3. 国网天津市电力公司电力科学研究院,天津 300384
  • 折叠

摘要

Abstract

Energy saving and emission reduction has always been a hot issue that countries in the world continue to care a-bout.The triple-generation system of combined cooling,heating and power system is widely used because of its higher pri-mary energy utilization.For the capacity allocation and operation mode planning of the combined cooling,heating and power system,a comprehensive evaluation index considering exergy loss is proposed as the objective function of optimiza-tion,and the function optimizes the system from three aspects of high efficiency,economy and low emission.Taking the capacity and operation mode of the gas turbine as design variables,the research model of capacity allocation and operation mode of triple-generation system is established.This method is applied to the co-generation system of a hotel building for analysis and planning.The research results show that the optimal capacity of the gas turbine is 200 kW,and the combina-tion of heat and power is the optimal operation mode.Under this mode,the combined cooling,heating and power system has a 3.5% lower exergy loss rate than the traditional energy supply system;the annual comprehensive emissions is re-duced by 593.7 t;the annual economic cost is saved by 298 000 yuan.This method can comprehensively and objectively analyze the system performance under a certain capacity and certain operation mode,which provides a reference for solving the operation planning problems of the combined cooling,heating and power system.

关键词

冷、热、电三联供系统/运行模式/容量配置

Key words

CCHP system/operation mode/capacity allocation

分类

信息技术与安全科学

引用本文复制引用

王剑锋,王旭东,李峰,戚艳,邬斌扬,苏万华..考虑㶲损失的三联供系统容量配置与运行模式研究[J].电测与仪表,2024,61(1):113-118,6.

基金项目

天津市重点研发计划科技支撑重点项目(18YFZCGX00570) (18YFZCGX00570)

国网天津市电力公司科技项目(KJ19-1-17) (KJ19-1-17)

电测与仪表

OA北大核心CSTPCD

1001-1390

访问量0
|
下载量0
段落导航相关论文