| 注册
首页|期刊导航|电力建设|"双碳"目标下未来配电网构建思考与展望

"双碳"目标下未来配电网构建思考与展望

冀肖彤 杨东俊 方仍存 雷何 查晓明 孙建军

电力建设2024,Vol.45Issue(2):37-48,12.
电力建设2024,Vol.45Issue(2):37-48,12.DOI:10.12204/j.issn.1000-7229.2024.02.004

"双碳"目标下未来配电网构建思考与展望

Research and Prospect of Future Distribution Network Construction under Dual Carbon Target

冀肖彤 1杨东俊 2方仍存 2雷何 2查晓明 3孙建军3

作者信息

  • 1. 国网湖北省电力有限公司,武汉市 430077
  • 2. 水火电和新能源资源优化配置与规划技术实验室(国网湖北省电力有限公司经济技术研究院),武汉市 430077
  • 3. 武汉大学电气与自动化学院,武汉市 430072
  • 折叠

摘要

Abstract

The new power system driven by the"dual carbon"goal cannot adapt to the top-down energy/power balance mode at different temporal and spatial scales.Therefore,it is urgent to conduct relevant research on the construction path of the future power grid,particularly the distribution network.The micro-energy network,a comprehensive energy network with self-balance regulation ability,can leverage the pivotal role of power grids in promoting zero-carbon/low-carbon energy production and consumption and will play a pivotal role in future power grid transformation and upgrading.First,the evolution stages and modes of traditional distribution networks,active distribution networks,and future low-carbon distribution networks are summarized and compared.Second,based on the characteristics of"source-network-load"in the future,a type of future distribution network construction idea of bottom-up evolution layer by layer is proposed by constructing micro-energy network and utilizing the interconnection and interaction between micro-energy network units and distribution network.Additionally,a type of atomic future distribution network is introduced.Finally,future research directions for the evolution of distribution networks are discussed from different perspectives.

关键词

微能网/自下而上/智慧互联/原子型未来配电网

Key words

micro-energy network/bottom-up/intelligent interconnection/atomic future distribution network

分类

信息技术与安全科学

引用本文复制引用

冀肖彤,杨东俊,方仍存,雷何,查晓明,孙建军.."双碳"目标下未来配电网构建思考与展望[J].电力建设,2024,45(2):37-48,12.

基金项目

This work is supported by the National Key R&D Program of China(No.2022YFB2402700)and Science and Technology Project of State Grid Hubei Electric Power Co.,Ltd.(No.52153820000H).国家重点研发计划项目(2022YFB2402700) (No.2022YFB2402700)

国网湖北省电力有限公司科学技术项目(52153820000H) (52153820000H)

电力建设

OA北大核心CSTPCD

1000-7229

访问量0
|
下载量0
段落导航相关论文