基于LEC+Grey-DEMATEL的沙漠公路施工安全风险控制研究
Research on Safety Risk Control of Desert Highway Construction Based on LEC+Grey-DEMATEL
摘要
Abstract
The outline of the 14th Five-Year Plan of the State proposes to speed up the construction of a strong transportation country,strengthen the construction of strategic backbone channels out of Xinjiang and into Tibet and in the central and western regions,and increase the number of desert highways,which is of great significance for improving the nodes of the transportation network and developing the economy in remote areas.It is difficult to build highway in desert area,the bearing capacity of subgrade in desert is low,the engineering safety and quality problems are easy to occur,and there is the threat of wind-deposited sand.In addition,the communication conditions in the desert are poor,the basic life guarantee is difficult,the transportation and preservation of materials are more difficult,and there are more construction safety risks.Therefore,it is of great practical significance to find out the key risk factors of desert highway construction and analyze the interaction between them,so as to effectively control the safety risk of desert highway construction.This paper adopts the risk assessment method to build a risk assessment model suitable for desert highway(LEC+Grey-DEMATEL model),and based on the Taklimakan hinterland desert highway project,the construction risk level of the example is verified.First of all,the risk analysis of LEC was used as the index screening framework to identify the risk sources of desert highway construction,and 54 risk sources were identified by consensus,including 3 large risks,35 general risks and 16 low risks.Secondly,by analyzing the safety management factors of risk sources,the impact of low risk sources was not considered,and only general risks and high risk sources were analyzed.Safety accidents caused by various hazard sources can be classified into four aspects of safety management:human,physical,management and environment.The factor system is integrated,and through questionnaire consultation,the risk impact factor evaluation index system is finally constructed,and 18 factors are extracted from four aspects:personnel risk,machinery,equipment and material management risk,organization management risk and operating environment risk.Finally,Grey-DEMATEL model are used to study the internal relationship between the factors affecting the construction safety risk of desert highway.The stability and consistency of the model are evaluated by reassigning expert weights.The research results show that the model has a good stability,safety supervision is not in place is the key factor affecting the desert highway construction safety risk,high temperature weather is the main reason,safety protective equipment wearing is the main result factor.The research results are consistent with the actual construction safety risk state of the case,and the influencing reasons of key risk factors and control measures are analyzed and explained.This paper innovatively puts forward a feasibility model suitable for desert highway construction safety risk assessment,verifies the feasibility and effectiveness of the model,and provides a theoretical basis for effectively controlling desert highway construction safety risks,formulating special construction plans for desert construction safety,and putting forward targeted risk control measures.关键词
沙漠公路/施工安全风险/影响因素/作业条件危险性分析法/灰色理论-决策实验室模型Key words
desert highway/construction safety risk/influencing factors/operating condition hazard analysis/grey theory-Dematel model分类
交通工程引用本文复制引用
罗予泽,王首绪,罗桢..基于LEC+Grey-DEMATEL的沙漠公路施工安全风险控制研究[J].工程研究——跨学科视野中的工程,2024,16(1):50-61,12.基金项目
湖南交通科技进步与创新项目:湖南省应急管理厅2018年安全生产科技研究项目"交通隧道工程施工安全风险预警及管控研究"(201330) (201330)