| 注册
首页|期刊导航|河南水利与南水北调|中洞抽水蓄能电站上水库工程地质条件分析及评价

中洞抽水蓄能电站上水库工程地质条件分析及评价

谢海峰

河南水利与南水北调2023,Vol.52Issue(12):25-26,2.
河南水利与南水北调2023,Vol.52Issue(12):25-26,2.

中洞抽水蓄能电站上水库工程地质条件分析及评价

Analysis and Evaluation of Engineering Geological Conditions of Upper Reservoir of Zhongdong Pumped Storage Power Station

谢海峰1

作者信息

  • 1. 广东省水利电力勘测设计研究院有限公司,广东 广州 510635
  • 折叠

摘要

Abstract

Pumped storage power station,as an efficient,flexible,reliable and environmentally friendly energy reserve scheme,can effectively promote the consumption of new energy,reduce the overall energy consumption of the system,and ensure the safe and stable operation of the power grid.Therefore,in order to ensure the smooth and safe operation of Huizhou Zhongdong pumped storage power Station project,it is one of the keys to evaluate and analyze the geological conditions of the upper reservoir and ensure the storage and anti-seepage capacity of the upper reservoir.Huizhou Zhongdong pumped storage Power Station is located in Zhongdong Village,Huidong County,Huizhou City,Guangdong Province.The upper reservoir area is in the upper reaches of Yangmeishui River,with a catchment area of 0.72km2.This paper mainly introduces,analyzes and evaluates the engineering geological conditions such as topography,formation lithology,geological structure,hydrogeological conditions and physical geological phenomena of the upper reservoir of the Zhongdong pumped storage power Station in Huizhou,discusses the engineering geological problems such as slope stability and leakage around the dam,and puts forward corresponding treatment measures.It provides a scientific basis for the seepage prevention and reinforcement and construction of reservoir in the later period.

关键词

中洞抽水蓄能电站/水库渗漏/工程地质评价

Key words

Zhongdong Pumped-storage Station/reservoir leakage/engineering geological evaluation

分类

建筑与水利

引用本文复制引用

谢海峰..中洞抽水蓄能电站上水库工程地质条件分析及评价[J].河南水利与南水北调,2023,52(12):25-26,2.

河南水利与南水北调

1673-8853

访问量0
|
下载量0
段落导航相关论文