| 注册
首页|期刊导航|四川水力发电|玉瓦水电站引水隧洞衬砌结构计算优化设计

玉瓦水电站引水隧洞衬砌结构计算优化设计

祖威

四川水力发电2023,Vol.42Issue(6):112-115,4.
四川水力发电2023,Vol.42Issue(6):112-115,4.

玉瓦水电站引水隧洞衬砌结构计算优化设计

Optimization Design of Concrete Lining Structural Calculation for Headrace Tunnel of Yuwa Hydropower Project

祖威1

作者信息

  • 1. 中国电建集团成都勘测设计研究院有限公司,四川成都 610072
  • 折叠

摘要

Abstract

Yuwa Hydropower Station is one of the projects adopting the EPC contract mode type in PowerChina Chengdu Engineering Corporation Limited.The project estimated investment of Yuwa Hydropower Project is much higher in the feasibility study stage.After optimization of technical proposals was done for many times,the project was successfully in construction on time.In order to control the project cost,combined with the risk analysis of uncertainty in underground engineering,the optimization of design parameters of excavation and concrete lining for long headrace tunnel is one of the fine design methods of hydropower station.This paper in-troduces the reinforcement calculation of concrete lining design for headrace tunnel with the structural mechan-ics and finite element method.Though comparative analysis,optimizing reinforcement quantity and reducing project investment are achieved.This paper summarizes some experience of optimizing the lining structure in headrace tunnel,which can be used as reference for other similar projects.

关键词

引水隧洞/有限单元法/衬砌结构计算/优化工程量

Key words

Headrace tunnel/Finite element method/Structural calculation of concrete lining/Optimizing rein-forcement quantity

分类

建筑与水利

引用本文复制引用

祖威..玉瓦水电站引水隧洞衬砌结构计算优化设计[J].四川水力发电,2023,42(6):112-115,4.

四川水力发电

1001-2184

访问量0
|
下载量0
段落导航相关论文