四川水力发电2023,Vol.42Issue(6):116-119,4.
在新型电力系统中大型水电机组调相运行可行性分析
Feasibility Analysis of Phase Modulation Operation of Big Hydropower Units in New Power Systems
彭桥 1张鹏 2周俊全3
作者信息
- 1. 国能粤电台山发电有限公司,广东台山 529200
- 2. 中国电建集团成都勘测设计研究院有限公司,四川成都 610072
- 3. 国电大渡河流域水电开发有限公司,四川成都 610041
- 折叠
摘要
Abstract
In the new power system,with the continuous introduction of new energy sources,the conventional hydropower station change operation from a single generation mode to to one that adapts to the complementary needs of multiple energy sources.The first attempt has been made in a hydropower station to add phase modu-lation operation for big hydropower units.This paper explores in detail the impact of phase-modulated opera-tion of large hydropower units on the design and the corresponding adaptation modifications on the original e-quipment,such as generators,turbines and auxiliary systems.This analysis method is suitable for the similar electromechanical equipment and to promote traditional hydropower units to make greater contributions in the development of new power systems.关键词
大型水电机组/压水调相/新型电力系统多能互补Key words
Big hydropower units/Condenser dewatering/New power systems with multi-energy complementation分类
信息技术与安全科学引用本文复制引用
彭桥,张鹏,周俊全..在新型电力系统中大型水电机组调相运行可行性分析[J].四川水力发电,2023,42(6):116-119,4.