世界有色金属Issue(21):154-156,3.
圭亚那奥罗拉金矿爆破方案优化研究
Optimization of blasting scheme for the Aurora gold mine in Guyana
李洪豪 1赵云 1谢学之1
作者信息
- 1. 中国水利水电第十工程局有限公司矿业公司,四川 成都 610037
- 折叠
摘要
Abstract
With the rapid development of the national new energy industry,the corresponding demand for supportive metal resources has also shown a stepwise growth.At the same time,the demand for metal ore at the source has also shown a stepwise growth,driving the leapfrog development of the entire mining enterprise and increasing the strength of resource development.At the same time,blasting,as the first process of open-pit metal mining,plays a crucial role in the efficiency and cost of the entire mining.This article mainly analyzes the blasting problems encountered during the mining process of the Aurora gold mine in Guyana.Especially for blasting with different rock types and water holes,suitable blasting schemes are proposed,which can also provide experience and reference for similar mining construction.关键词
金矿/水孔/爆破方案Key words
gold mine/Water hole/Blasting plan分类
矿业与冶金引用本文复制引用
李洪豪,赵云,谢学之..圭亚那奥罗拉金矿爆破方案优化研究[J].世界有色金属,2023,(21):154-156,3.