铁路通信信号工程技术2024,Vol.21Issue(1):98-102,115,6.DOI:10.3969/j.issn.1673-4440.2024.01.018
QC小组法在列控系统集成项目中的应用
Application of Quality Control Circle in Train Control System Integration Project
单鹤玲1
作者信息
- 1. 北京全路通信信号研究设计院集团有限公司,北京 100070
- 折叠
摘要
Abstract
Considering the necessity and importance of applying quality management in the integration project of high-speed railway train control system,this paper firstly makes systematic research on theories related to project quality management.On this basis,it makes a further analysis on the modes and methods of quality management(Quality Control Circle)by taking the successful experiences of quality management in the implementation process of Shanghai-Hangzhou high-speed railway train control system integration project as an example,hoping to provide a solution of quality management method suitable for integration project of high-speed railway train control system,so as to effectively guarantee the project quality,ensure the safety of high-speed railway transportation,and support the development of high-speed railway industry.关键词
QC小组/高铁列控系统/系统集成项目/质量管理Key words
Quality Control Circle(QCC)/train control system for high-speed railways/system integration project/quality management分类
交通工程引用本文复制引用
单鹤玲..QC小组法在列控系统集成项目中的应用[J].铁路通信信号工程技术,2024,21(1):98-102,115,6.