天然气与石油2023,Vol.41Issue(6):38-43,6.DOI:10.3969/j.issn.1006-5539.2023.06.006
油气管道定向钻穿越"多接一"回拖的难点与应对
Challenges and countermeasures of managing multiple connections-pullback in horizontal directional drilling of oil and gas pipelines
摘要
Abstract
With the wide application of horizontal directional drilling technology,the method of multiple connections-pullback,primarily referring to those involving dozens of connections,is crucial in addressing the issue of spatial constraints at the drilling site.Nonetheless,this method does come with its own set of limitations.By analyzing and comparing various engineering examples,this paper aims to highlight the differences and technical challenges between multiple connections-pullback and traditional pullback methods in the context of horizontal directional drilling.This paper also proposes potential countermeasures,offering theoretical references and successful experiences for future projects of the same nature.The multiple connections-pullback method is suitable for application under stable formation conditions such as bedrock.Each process must be closely connected,and the suspension time of pullback should be minimized to ensure a successful construction process.When combined with methods such as pipe-laying ship and support frames for pipe sending,the multiple connections-pullback method holds significant promise for widespread applications.关键词
定向钻/"多接一"/回拖Key words
Directional drilling/Multiple connections/Pullback引用本文复制引用
赖思宇,田延彬,秦政先,刘雪梅,向玉琪..油气管道定向钻穿越"多接一"回拖的难点与应对[J].天然气与石油,2023,41(6):38-43,6.基金项目
深圳妈湾电力有限公司项目"妈湾电厂升级改造项目天然气管道接入工程大铲岛至妈湾电厂供气专线EPC项目"(S202304100E0) (S202304100E0)