论取水工程原水自流管水下施工技术

裴瑞

云南水力发电2024,Vol.40Issue(1):1-4,4.
云南水力发电2024,Vol.40Issue(1):1-4,4.DOI:10.3969/j.issn.1006-3951.2024.01.001

论取水工程原水自流管水下施工技术

Underwater Construction Technology for Raw Water Self Flowing Pipes in Water Intake Projects

裴瑞1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

With the rapid development of cities,water consumption has also increased rapidly,and the diameter of water pipelines is also getting larger.The construction technology of large-diameter sunken pipes is developing rapidly.Taking the construction of the natural water flow pipeline sinking project of the water intake project of Guangxi Fusui Second Water Plant as an example,this paper systematically introduces the key processes of the natural water flow pipeline sinking construction.

关键词

自流管/水下沟槽开挖/沉管施工/关键工序

Key words

gravity line/underwater trench excavation/sinking construction/key process