连续梁桥现浇段施工技术分析

王锋

云南水力发电2024,Vol.40Issue(1):5-9,5.
云南水力发电2024,Vol.40Issue(1):5-9,5.DOI:10.3969/j.issn.1006-3951.2024.01.002

连续梁桥现浇段施工技术分析

Analysis of Construction Technology for Cast-in-place Section of Continuous Beam Bridge

王锋1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

Continuous beam bridge has been widely used in highway engineering and municipal engineering.Usually,people pay more attention to the cantilever construction of continuous beams and the construction of No.0 blocks,while neglecting the construction of the cast-in-place section of transition piers.The quality of cast-in-place section construction is one of the key factors affecting the quality of continuous cast-in-place beam construction,which is crucial for the smoothness of driving and the durability of the bridge after completion.Taking the construction of a continuous beam bridge's cast-in-place section as an example,this paper analyzes and summarizes the construction technology of the cast-in-place section.

关键词

现浇段/连续梁桥/过渡墩/施工质量

Key words

cast-in-place section/continuous beam bridge/transition pier/construction quality