摘要

Abstract

Subway construction is mostly carried out in densely populated and built-up areas,with limited construction conditions.When designing subway lines,it is common to choose to start and receive on curves,which can easily cause the shield tunneling in and out of the tunnel structure to exceed the limit,water inrush or collapse at the tunnel entrance.In order to prevent such incidents from occurring and complete the initiation and reception on the curve with quality and safety,this shield tunneling curve initiation construction technology is often applied in shield tunneling construction.Among the 9 shield tunneling machines of Shenzhen Metro Line 7 Bid 7306,5 of them started on the curve and achieved good technical and economic results,gaining a good social reputation.

关键词

盾构曲线/始发/施工技术/盾构进洞

Key words

shield tunneling curve/start/construction technology/shield tunneling

分类

交通工程

引用本文复制引用

唐德平..盾构曲线始发施工技术[J].云南水力发电,2024,40(1):10-15,6.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文