| 注册
首页|期刊导航|云南水力发电|山区高速公路项目前期工作中设计优化的思路

山区高速公路项目前期工作中设计优化的思路

肖文杰 张成祥

云南水力发电2024,Vol.40Issue(1):141-143,3.
云南水力发电2024,Vol.40Issue(1):141-143,3.DOI:10.3969/j.issn.1006-3951.2024.01.033

山区高速公路项目前期工作中设计优化的思路

Design Optimization Ideas in the Preliminary Work of Mountain Expressway Projects

肖文杰 1张成祥1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

The development of highway engineering in our country is rapid,and most projects only take a few years from approval to opening to traffic.However,with the rapid progress of projects,the problems that were not considered in the design process are gradually exposed.Mainly from the perspective of construction technology and combined with the actual situation on site,this paper analyzes the design optimization ideas in the early stage of mountainous expressway projects from the aspects of bridge reconstruction,line adjustment,prefabricated T-beam length optimization,material adjustment,and puts forward corresponding suggestions.

关键词

山区高速公路/前期工作/设计优化

Key words

mountain expressway/preliminary work/design optimization

分类

交通工程

引用本文复制引用

肖文杰,张成祥..山区高速公路项目前期工作中设计优化的思路[J].云南水力发电,2024,40(1):141-143,3.

云南水力发电

1006-3951

访问量0
|
下载量0