| 注册
首页|期刊导航|云南水力发电|高速公路隧道工程二次衬砌脱空率控制措施

高速公路隧道工程二次衬砌脱空率控制措施

张海波

云南水力发电2024,Vol.40Issue(1):166-168,3.
云南水力发电2024,Vol.40Issue(1):166-168,3.DOI:10.3969/j.issn.1006-3951.2024.01.040

高速公路隧道工程二次衬砌脱空率控制措施

Control Measures for Secondary Lining Void Rate in Expressway Tunnel Engineering

张海波1

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

Abstract

The lining void has long been a difficult problem that troubles tunnel construction,and this phenomenon has a direct impact on the quality of tunnel construction.Against the backdrop of extensive construction of expressways,the issue of tunnel engineering voids has become a focus and has attracted widespread attention.This paper conducts in-depth analysis and research on the problem of secondary lining void in expressway tunnel engineering.Firstly,the causes of lining void formation were analyzed,mainly including improper construction techniques,material quality issues,and complex geological conditions.Secondly,based on my own experience in tunnel construction,corresponding opinions and measures have been proposed.Specifically,it includes strengthening construction process control,improving material quality,and strengthening geological exploration and monitoring.By implementing these measures,the occurrence of lining void can be effectively reduced,and the quality of tunnel construction can be improved.

关键词

高速公路/隧道工程/二次衬砌/脱空/措施

Key words

expressway/tunnel engineering/secondary lining/void/measure

分类

交通工程

引用本文复制引用

张海波..高速公路隧道工程二次衬砌脱空率控制措施[J].云南水力发电,2024,40(1):166-168,3.

云南水力发电

1006-3951

访问量6
|
下载量0
段落导航相关论文